![]() |
||||
![]() |
![]() |
|||
![]() |
||||
![]() |
||||
![]() |
||||
![]() |
||||
![]() |
||||
For the Long Term Control Plan
(These documents are in PDF format. If you do not have a program to view PDF files, click here to download Adobe Reader software for free.)
Hydraulic Model Workplan - (pdf format) - 1.22mb
Data Management Plan - (pdf format) - 3.85mb
Water Quality Modeling Workplan
Water Quality Baseline Technical Memorandum
Quality Assurance/Quality Control Plan - (pdf format) - 75.8kb
Sensitive Areas Technical Memorandum
Outfall Elimination or Relocation Technical Memorandum - (pdf format) - 897kb
Mill
Street Wastewater Treatment Plant Collection System
and Capacity Analysis
Technical Memorandum - (pdf format) - 9.3MB
Hydraulic Model Technical Memorandum
Preliminary Screening Summary of Control Technologies - (pdf format) - 11.3MB
Post Construction Monitoring Program Description - (pdf format) - 28.2MB
Analysis
of Alternative Control Technologies
& Recommended Control Plan Technical Memorandum - (pdf format) - 33.7MB
Final
Long Term Control Plan (Report) or (Appendices)