COMPLETED DOCUMENTS
For the Long Term Control Plan

(These documents are in PDF format. If you do not have a program to view PDF files, click here to download Adobe Reader software for free.)

Hydraulic Model Workplan - (pdf format) - 1.22mb

Data Management Plan - (pdf format) - 3.85mb

Water Quality Modeling Workplan

Water Quality Baseline Technical Memorandum

Quality Assurance/Quality Control Plan - (pdf format) - 75.8kb

Sensitive Areas Technical Memorandum

Outfall Elimination or Relocation Technical Memorandum - (pdf format) - 897kb

Mill Street Wastewater Treatment Plant Collection System
and Capacity Analysis Technical Memorandum
- (pdf format) - 9.3MB

Hydraulic Model Technical Memorandum

Preliminary Screening Summary of Control Technologies - (pdf format) - 11.3MB

Post Construction Monitoring Program Description - (pdf format) - 28.2MB

Analysis of Alternative Control Technologies
& Recommended Control Plan Technical Memorandum
- (pdf format) - 33.7MB

Final Long Term Control Plan (Report) or (Appendices)